dock crane meaning in Chinese
船坞起重机
Examples
- The fourth part concentrates on the crucial section , dock crane , and establishes a model to allocate dock cranes , and gives a solution
第四章围绕研究的主要目标,抓住系统中的中心关键环节? ?门机,利用解乘数法,建立和求解门机分配模型。 - Then , as such , the first goal toward maximum efficiency is obtained . the fifth part establishes the model to allocate flow machines in the assembly line according to above dock crane efficiency , furthermore , uses dynamic planning method to draw a final solution in order to reach maximum efficiency and minimum cost of the assembly line
第五章以门机分配为基础,建立流动机械的网络分配模型,对已经分配的门机作业量,在流动机械网络中进行再分配,并利用动态规划的方法进行求解,确定优化的工艺流程方案和机械类型、型号、数量的分配,从而实现效率最大、成本最低的优化目标。